TL;DR
SpaceX signed a $67 million contract with German solar equipment maker Singulus Technologies to build HJT solar cell production lines for its Starmind orbital AI satellite network, with Elon Musk claiming a 100 GW/year buildout that could theoretically add $1 trillion in annual revenue.
What happened
- SpaceX signed a supply contract with Singulus Technologies on Nov. 10, 2026, for one turnkey HJT solar cell production line valued at more than €60 million (about $67 million).
- The contract exceeds Singulus's entire 2025 revenue of €48.3 million, making SpaceX its single largest customer by a wide margin.
- First line delivery is scheduled for H1 2027, targeting SpaceX's Bastrop, Texas manufacturing facility.
- Musk posted that SpaceX ordered 100 GW/year of HJT solar manufacturing equipment to power Starmind, described as a "sentient sun" constellation of AI compute satellites.
- SpaceX's AI1 satellite specs call for a 75-meter wingspan, up to 250 kW peak compute draw, and sun-synchronous orbit with laser links to the Starlink network.
Why it matters
- 100 GW/year would be roughly 6x First Solar's entire 2026 output, signaling an industrial-scale solar manufacturing ambition unlike anything in the terrestrial market.
- Musk's own math: 100 GW at $10/watt in orbit equals $1 trillion in annual revenue, which is 3x the consensus analyst forecast for SpaceX's total 2028 revenue of $333 billion.
- SpaceX is vertically integrating solar cell production in Texas, reducing dependence on outside suppliers for a critical satellite component.
- The Singulus partnership started in March 2026 with SpaceX providing direct loans, meaning financial ties predate the public contract announcement.
- Musk has acknowledged that flooding the market with cheap orbital compute could cannibalize pricing, a tension the $10/watt assumption does not resolve.
What to watch next
- Whether Singulus announces additional production lines beyond the first: the company said it plans more lines to support 100 GW capacity, but only Musk has called that annual.
- First AI1 satellite launch timeline: Starmind's commercial viability depends on demonstrating the compute-in-orbit model works at scale before the 2027 line delivery.
- SpaceX revenue guidance updates: if orbital compute pricing tracks anywhere near the $30 to $50/watt ground compute benchmark rather than $10, the trillion-dollar math collapses significantly.
Originally published on Present of AI, a daily source-linked AI news timeline. Read the full timeline or browse the open dataset.